Advantage:

1, Energy saving Because the external hanging board is a 50 thick extruded board sandwiched between two sides of concrete, its thermal insulation performance is better than that of the external wall or the internal wall of the traditional building. At the same time, it also solves the problem of the external wall decoration falling off caused by the external insulation of the traditional building;

2, Environmental protection Because of the factory production, the construction waste on the construction site is greatly reduced, so it is more environmentally friendly;

3. Save template Because the laminated plate is used as the bottom formwork of the floor slab and the external hanging plate is used as one side formwork of the shear wall, a large number of formworks are saved;

4. Shorten construction period Because a large number of wallboards and prefabricated laminated boards are produced in the factory, the construction intensity on site is greatly reduced, and even the masonry and plastering processes are omitted, so the overall construction period is greatly shortened;

Disadvantages:

1. Accurate setting out and elevation measurement are required Due to the factory production, the size of the prefabricated components has been fixed. If the size is too small during setting out, the prefabricated components will not be installed. If the size is too large during setting out, the structure will cause the phenomenon of large joint. At the same time, in the field construction, the elevation of the shear wall should also be well controlled, otherwise, the installation of the laminated plate will be uneven or the laminated plate will be leveled by the longitudinal calculation, and there will also be a large gap between the plate and the shear wall, and it will be more troublesome to re support the formwork;

2. High requirements for the position accuracy of reserved holes Due to the concrete structure of the prefabricated building, it is required that the size and location should be as accurate as possible when reserving and embedding. Otherwise, it is necessary to re slot and re open holes, which will increase the construction difficulty and even affect the structure;

3. The gap at the bottom of the plate is octagonal, which may fall off easily after pointing According to the field observation, the precast slab is an inverted octagonal slab with large size and small size, and the slab joint formed between the two slabs is a regular octagonal slab. Therefore, although crack resistant mortar is used for pointing, it is easy to fall off and hurt people. Therefore, it is suggested to change the precast slab to a regular octagonal slab with large size and small size, so the joint between the two slabs is an inverted octagonal slab, and the slab can be The joint and the laminated plate are cast in situ together;

4. There are also some errors in the size of prefabricated components, sometimes the gap is too large or uneven during assembly Although it is factory production, prefabricated components may also have certain size deviation. At the same time, due to the human error in site construction, sometimes the gap is too large or uneven during assembly;

5. Rubber strip without water stop for external hanging plate In the design of the external hanging board of the prefabricated building, there are some flat floor boards with waterstop rubber strips, and some external hanging boards 200 higher than the floor have no waterstop rubber strips. If there is no water stop rubber strip, although the outer joint is treated with weather resistant rubber, there is still the possibility of leakage. It is suggested that all the hanging boards should have water stop rubber strips;

6. Some door frames are not embedded with wood bricks Some of the door frames are not embedded with wood bricks, which will cause the user to be unable or difficult to install the door in the future decoration process. It is suggested that when prefabricating the interior wall in the future, when there is a door, the wood bricks should be embedded on the door frame to facilitate the user's future decoration use;

7. The weatherproof adhesive is used for exterior wall joint treatment, which is inconvenient to replace after aging. Although the service life of weatherproof adhesive is 30 years, there are many adverse environmental factors, which reduce the service life of weatherproof adhesive. Once the weatherproof adhesive is replaced, the construction is extremely convenient;

8. Compared with the cost of traditional construction, the cost of assembly construction is much higher The floor thickness of traditional buildings is about 100 thick, while that of assembly buildings is 60 thick laminated plate plus 80 thick cast-in-place plate, with the overall thickness reaching 140, which is much thicker than that of traditional buildings; the external wall hanging plate is connected with the shear wall, which greatly increases the thickness of the external wall and the materials used. All of these lead to the increase of cost. At the same time, due to the increase of the thickness of the external wall, the user in the same building area, the clearance area of the prefabricated building is much smaller than that of the traditional building, which leads to the square meter cost of the prefabricated building is much more expensive than that of the traditional building, which is not easy to be accepted by the consumers;

9, the cost management department can not follow up the quota, resulting in a single manufacturer, and the price has the final say of the manufacturer. The assembly building is still in the new stage of development in China. The quota of the cost management department can not be followed up in real time. This causes a phenomenon of the biggest manufacturer, and the cost has the final say of the manufacturer, which is also not conducive to the development of the fabricated building.

10. As the external formwork of the shear wall, sometimes there are too few holes reserved for the opposite pulling screw, which will cause the external movement of the external hanging plate during the concrete pouring During the construction of shear wall in prefabricated building, because the external hanging plate is used as one side of the shear wall formwork, and sometimes the reserved counter pulling screw holes on the external hanging plate are too few, the rigidity of the whole formwork system may be insufficient, so that the external hanging plate will shift outward during the construction of shear wall concrete

 